2015 after the performance test the mill achieved a capacity increase of 10 and an energy reduction of 10 too the acceptance protocol was signed by both parties in january 2017 nowadays the mill is operated with 543 th and 1221 kwht throughput specic energy consumption material moisture before retrot 510 th 1225 kwht 23 h 2 o.